Projects

* Al-Mukawilon Projects
Year Project Name Location Employer Consultant Description Value US$
ongoing Construction of Al-Aloul Center Building Project Nablus Aluol Family Arab Engineering Services & Consultation (ARABESC) The construction and finishing works (Turnkey) for additional four floors with a total built-up area of 2,350 m2 on an already constructed commercial building in the city center. 1 Million
2014-ongoing Reef Villas project contract (5/Abu Qash - Reef) Ramallah/ Abu Qash Byder for development and real estate. Al-Moghrabi Office for Engineering Consultations The construction of 30 luxury villas of, turnkey project. (Stage#1 + #2 ), Widening and rehabilitation of the main street,Structural Excavations for the Business Commercial Complex , Construction and Finishing the Business Commercial Complex component of three separate buildings. 11.1 Million
ongoing Construction and Finishing the Business Commercial Complex Ramallah/ Abu Qash Byder for development and real estate. Arabtech Jardaneh Group The Construction and Finishing of the Business Commercial Complex (Turnkey) consist of three separate buildings. Each building consist of a floor for commercial stores, two floors for studios in buildings BC2 and BC3, and a floor for commercial stores, three floors for studios in building BC1, in addition to all related external works such as ( gardens, parking lots, landscaping, and complete infrastructure).            1,753,172
ongoing Reef Villas Project Contract
(5/Abu Qash - Reef) – Stage #2
Ramallah/ Abu Qash Byder for development and real estate. Arabtech Jardaneh Group The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe. 3 Million
2016 Reef Villas Project Contract
(5/Abu Qash - Reef) – Stage #1
Ramallah/ Abu Qash Byder for development and real estate. Al-Moghrabi Office for Engineering Consultations The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe.            3,188,195
2015 Reef Villas-Phase one/Roads                         contract (4/Abu Qash - Reef) Ramallah/ Abu Qash Byder for development and real estate. Al-Moghrabi Office for Engineering Consultations Widening and rehabilitation of the main street along the 1200 m including the construction of sidewalks, road markings and signs.
Excavation and leveling all internal roads with approximate length of 1260 m for the development.
The construction of boulder stone retaining walls at the eastern property line of the project with an area of approximate 1000 m²
           1,239,932
             
2014 Amaar Tower Construction AlBeireh Amaar Group JV CC & UNIVERSAL GROUP The Project is located within Al Ersal Center in Al-Bireh, Palestine. The main building consists of 18 floor (including 3 basements) with an approximate built-up area of 29,900m2. The basement will be dedicated for services, storage facilities and car parking, the Ground and Mezzanine floors will be dedicated for retail use, while the remaining floors will be dedicated for office use.
Work consist of all civil work and Electro-Mechanical work related
18.6 Million 
Jericho Waste Water Collection, Treatment System & Reuse Project Jericho PWA Palestinian Water Authority NJS Consultant Co. Ltd. The scope of works covered by this tendering (hereinafter referred to as "the Work") of the Project consists of the followings:
- Civil Construction Work
a) Wastewater Treatment Plant (WWTP) : Capacity 9,800m3/day
   - Wastewater receiving tank, grit chamber, reactor, clarifier, disinfection tank, irrigation tank, sludge thickener, sludge drying bed and mechanical equipment for these treatment
- Power receiving facility, solar panel (capacity; 100kW), SCADA (Supervisory Control and Data Acquisition System) and electrical power/control facilities
- Pavement in the site and a garden including connection pipes for facilities with an overflow pipe.
b) Sewer Pipes: Total length =37km
- Trunk sewer installations with manholes and connection pits Dia.700-200mm                                             -Housing connection &pits Dia 6''
- Two pipe bridges For crossing Wadi
11.5 Million 
2012 Infrastructure Works for Al-Ersal Project – PK3 AlBeireh Arduna Real Estate Development Co. Center for Engineering Consulting (CEC) Executive sewage, water electrical and telecom networks and roads finishing                 494,549
2011 Excavations in Amaar, BOP and QB Towers-Enabling Works/PK-1 AlBeireh Amaar Group Jafar Toqan Office/Amaar Group Structural Excavations for Amaar, BOP and QB Towers with approximate quantity of 145,000m3              789,000
Al Ersal Development Project-Fence Package AlBeireh Arduna Real Estate Development Co. Arduna Real Estate Development Co. Installing and Fixing Safety Fence with approximate Length of (840 mr) and Installing and Fixing Hoarding Advertisement Fence with approximate Length of (315 mr).              176,564
PK-1 Excavation & Earthworks for Ring Road at Ersal Center Project AlBeireh Arduna Real Estate Development Co. Arduna Real Estate Development Co. Excavation&Earthworks for Ring Road,RoadC, RoadE&RoadF / with an approximate length of 850m              695,000
Water Loss Reduction Nablus Phase 2 Contract 4 Bid No. 85/1/63/2009 Nablus Nablus Municipality Lehmeyer International & ACE Project involves the construction of 2 - 1000 cubic meters reservoirs,1 - 750 cubic meters reservoirs, chambers, operation rooms for 30 pumps at 13 locations and many water distribution systems sreel & ductail iron pipes ranging in diameter from 200 mm to 350 mm for a total distance of 15.4 km.            9,579,913
Rehabilitation of connection roads for Baqa Ash sharqiya:phase 2:AnNazla Algarbiya - Tulkarm. Tulkarem CHF Baqa Ash sharqiya Municipality Milling+asphalt layer+road marking&signes                  50,130
Paving of Internal Roads in Different Areas in Nablus Nablus Nablus Municipality UNIVERSAL GROUP Excavation + Bascourse layers + paving Asphalt 7+5 cm adjustment Manholes + Concrete Protection              407,729
2010 IRD Road – TO 14 – Asira Al-Shamaliya – Yasid   (Segment 4) Asira Al-Shamaliya – Yasid  International Relief and Development, Inc. (IRD) MWH This project consists of upgrading 5.4 Km of Asira Shamalyia Yasid road. The road is a two-lane main road that connects Yasid-Beit Imreen Intersection with Asira Al Shamalyia , Jordan Valley and Nablus city . The SOW consists of excavation works , embankment filling , pavement layer construction , installation and/or rehabilitation of storm water drainage system , installation of safety features ( signage , road marking , cat eyes , and guard rails ) and any other work items needed to complete this project as specified .            2,035,383
2009 IRD Road – TO 3 - Tulkarem Tulkarem International Relief and Development, Inc. (IRD) MWH This road consists of upgrading 2.4 Km of Tulkarm road. The road is 4-2 lanes , main road located in Tulkarm city starts at Irtah crossing Terminal (sha’ar Ephraim Terminal) and ends at Tulkarm Khadouri Agriculture High school. The SOW consists of excavation works , embankment filling , pavement layers construction , installation and/or rehabilitation of storm water drainage system , installation of safety features ( signage , road marking , cat eyes , and guard rails ) and any other work items needed to complete this project as specification 2.2 Million 
Nablus Heart Center    Nablus Azzakat Committee Nablus. Arabtech Jardaneh Skeleton Works (Total Main Building Area = 12721m Note: Stopped by Client 3.4 Million.
2008 Concrete pipeline Factory-Beit Iba Nablus Palestinian Construction Product "PCP".   Steel Structure Work, including all construction and Electro-Mechanical Works   / Design and building project              470,000
2007 Rawabi Byder Building Ramallah Byder for development and real estate Byder for development and real estate Construction & Finishing Works including the Electro- Mechanical work, Elevator (9 Floor), 4000 m2 multistory building. & landscape work. 2   Million
Construction of Emergency unit and development of Existing Buildings Saint Luke's Hospital Nablus. Saint. Luke's Hospital Saint. Luke's Hospital Design and building project / The works include Construction, Completion, Maintenance and delivering up of The Emergency unit and development of the existing buildings at Saint luke's hospital              517,000
2005-2006 An-Najah National University/New Campus. Nablus. AN-Najah National University. AN-Najah National University   9,33 Million
  Finishing works and equipment supply for AN-Najah National University Auditorium Nablus. AN-Najah National University. AN-Najah National University 900 seats Auditorium Building - Design of all decoration & all systems such as Audio, Mixer, …act. , Construction & Finishing Works including electro-mechanical 1.5 Million.
  Entrance Building, Main Gate and Southern   boundary wall. External works, water tank Nablus. AN-Najah National University AN-Najah National University. Construction of Entrance Building ,(200m) length of stone boundary wall at main road. Rainwater collection tank capacity: 5,500 (cubic meters 2000m2 structure) / all sewage network, water network & asphalt roads              932,568
  Infrastructure for An-Najah National University/ New Campus Nablus. AN-Najah National University. AN-Najah National University. All underground facilities serving all the new campus buildings (around 12000 m)              634,753
  AN-Najah National University School of Fine Arts & Auditorium/13000m2 Nablus. AN-Najah National University. Jafar Tukan & Partners & Universal group for engineering & Consulting. All civil work, finishing electro-mechanical –elevators and landscape. Auditorium for 900 seat with design of all decoration & all systems such as Audio, Mixer, …act../13000m2 ( Building ). 6.3 Million 
             
2006 Construction of Multistory Building Nablus. Byder for development and real estate. AL Mukawilon Co. Construction & Finishing Works including the Electro- Mechanical work, Elevator       (9 Floor), 3000m2 multistory residential Building & landscape work. 1.5 Million
2005 Infrastructure for Zawata Land Development Project Zawata Area - Nablus Byder for development and real estate. Byder for development and real estate. Infrastructure including road works, lighting, water works for (80 000m2) land area development for residence.              500,000
2004 Repair and Re- construction of Electricity
Networks for Several streets
Nablus. Nablus Municipality / KFW-GERMANY Nablus Municipality 1.Faisal Street
2. Haifa Street
3. Amman Street
1 Million
Physical Education Building. Birzeit Birzeit University. Khateeb & Alami. Steel Structure and Playgrounds. Gymnasium Hall & Services with (1750m2) framed built up
Turnkey of All Construction and finishing work including the Electro – Mechanical work, landscape   work.
2 Million
2003 Salahia secondary School. Nablus. Municipality of Nablus. Municipality of Nablus. Construction & Finishing Works including the Electro- Mechanical works & landscape works./3000m2 Building. 1.5 Million.
2001 Naseeb Aziz Shaheen Building. Birzeit. Birzeit University. Birzeit University Engineering Office. Construction building of 1,480 sq, meters that houses various graduate studies programs. all civil, finishing & electromechanical works. 0.78 Million
Hard Landscape for Intercontinental Hotel. Beithlehem. Palestine Tourism Investment Co. ZARA. Execute the Landscape Work.  2.2Million
1999 Palestine National Authority Head Quarters. Nablus. PECDAR PECDAR Construction of 3000m2 building.            1,734,146
Contract 3 - Sewerage Network - Northern Area. Salfeet. Municipality of Salfeet. Dr. Beitelsmann & Partner & Associates. 5300 LM Main Sewerage Line and House Connections.               424,578
Beit Sourik Girls School. Ramallah Area. UNRWA UNRWA Construction of 3000m2 complete school building. 1.3 Million.
Medical Clinic. -Birzeit University Birzeit, Ramallah Area Birzeit University. Birzeit University Engineering Office. Complete Construction of 630m2 building including Finishing.              175,000
The Law Center. Birzeit, Ramallah Area. Birzeit University. Khateeb & Alami. Finishing works of 2100m2 building with Electro-Mechanical.              650,000
1998 Hisham Hijjawi College of Technology - Phase 1. Nablus. The College of Technology Founding Committee. Dar Al-Handasah (Shair & Partners ). All civil works, structure & landscape including steel structure multi purpose hall. 13000m2 structure including stone work.            3,557,932
Birzeit University Water Collection & Distribution Phase II. Birzeit. Birzeit University. Birzeit University Engineering Office. Under pressure Net Work 3000 L. M.  0.36 Million.
Abu Deese Secondary Girls School. Abu Deese / Jerusalem Area PECDAR PECDAR Construction & Finishing Works including the Electro- Mechanical work & landscape work.
5500m2 Building.
2 Million
1997 Stadium of Jericho. Jericho. Municipality of Jericho UNDP Construction and Finishing Works of the Stadium amphitheater, Football playground, basketball, and Volleyball playground, administration building, toilets, stores, change rooms all electro-Mechanical Works            1,422,738
Upgrading of President's Residence. Nablus Municipality of Nablus Municipality of Nablus Engineering Department. Turnkey renovation works.              878,557
Palestinian Energy Authority Warehouse. Tulkarem. Palestinian Energy Authority. Palestinian Energy Authority. Turnkey Construction of 1520m2 steel structure, 300m2 Administration building and landscape.Including the Electromechanical works.              782,710
1996 Extension to Al-Itihad hospital Nablus. UNDP UNDP Turnkey Construction including Electro-Mechanical and   Medical Gas System. 2 Million
Arab Investors Company Office Building. Jerusalem. Arab Investors Company. The Development & Planing Center Renovation work of building, area = 1500m2.               750,000
Al-Tereh - Greek Orthodox School-Phase 1.  Ramallah Greek Orthodox Patriarchate Anastas Engineering Co. Ltd. Construction & Finishing Works including the Electro- Mechanical work & landscape work.
1800m2 Building.
             600,000
Al-Bireh Sewerage Project Al-Bireh PECDAR • Consultant: Palestinian Economical Council for Development Execution of the sewerage works At Ramallah Al-Bireh              515,997
1995 Upgrading & Remodeling Qalqilia Hospital Qalqilia. UNRWA UNRWA                700,000
Sewerage Network at Nur Shams Refugee
Camp
Tulkarem Area. UNRWA UNRWA Construction of internal sewerage system at Nur Shams Refugee Camp              400,631
Ramallah Sewerage Project. Ramallah PECDAR • Consultant: Palestinian Economical Council for Development Execution of the sewerage works At Ramallah              406,460
College Floor to Workshops at Aqad Engineering Birzeit / Ramallah Birzeit University. Khatib & Alami. Renovation of Engineering department Office              360,000
1994 Construction of Industrial Units Ramallah Ramallah Municipality Ramallah Municipality   1.1 Million
Construction of Aqrabanieh Coed School Aqrabaniah /Jordan Valley UNRWA UNRWA Construction & Finishing Works including the Electro- Mechanical works & landscape works.
1800m2 Building
             700,000
Construction of Agricultural Training Center Jericho The Arab Development Society The Development & Planning Center                650,000
Sewerage Network (stage 2) at Askar Refugee Camp Nablus UNRWA UNRWA Construction of internal sewerage system at Asker Camp              301,413
Upgrading of Nablus Old City Water Network (stage 1) Nablus Municipality of Nablus UNDP Upgrading of Nablus Old City Water Network              250,000
Construction of the Palestinian Construction Products Company Factory Nablus Palestinian Construction Products Company                  250,000
Upgrading of UNRWA Director Offices Jerusalem UNRWA UNRWA                140,000
1993 Complete Finishing of Science and Technology Building Abu Deese / Jerusalem Area Science and Technology College The Development & Planning Center.                550,000
Sewerage Network for Tulkarem and Nur Shams RefugeCamps. Tulkarem UNRWA UNRWA Construction of sewerage connection line and manholes which connects both Nur Shams and Tulkarem camps to the treatment plant of tulkarem town              220,502
Upgrading of Dormitories. Jericho The Arab Development Society The Development & Planning Center                400,000
Comprehensive Maintenance of UNRWA Warehouses Nablus UNRWA UNRWA                250,000
Construction of Auto Electrical Workshop at Kalandia Training Center. Kalandia / Jerusalem area. UNRWA UNRWA                150,000
Construction of UNRWA Health Point Auja /Jericho area UNRWA UNRWA                100,000
Comprehensive Maintenance to Students' Dormitory and Clinical Kalandia Training Center. Kalandia / Jerusalem area UNRWA UNRWA                100,000
Private Building Amman AI-Mukawilon Co. Ltd Architect Hani Arafat.                700,000
1985-1992 Upgrading of Rafeedia Hospital Nablus The West Bank Health Department The West Bank Public Works Department   1.7 million 
1989 Wadi Faraa Irrigation Project Jordan Valley The Wadi Faraa Project Society Juzy & Partners   2.5 million 
  Private Residential Building (19 Apts). Nablus Hamdi Kanan, Nasser Kamal & George Rizek The Engineering Consulting Office   1.3 Million
  Internal Sewerage System at Balata Refugee Camp Nablus UNDP The Engineering & Planing Center 8. Improvement of sewage collection network of Balata Refugee Camp              700,000
  Comprehensive Maintenance UNRWA Field Office Jerusalem UNRWA. UNRWA                400,000
  Construction of New Extension at Saint Luke's Hospital. Nablus Anglican Church The Engineering Consulting Office. Internal road & asphalt for landscape works, stone retaining walls , Building of 2500m2 , Structure work and all landscaping              400,000
  Construction of Extension to Red Crescent Hospital Jenin Red Crescent Society The Engineering Consulting Office                400,000
  Telephone Company Building Jenin Local Phone Authority Local Phone Authority                200,000
  Private works that include building of villas and renovation of Churches in Nablus, Jerusalem and Bethlehem         1.5 Million.