Jericho Waste Water Collection, Treatment System & Reuse Project
Location
Jericho
Employer
PWA Palestinian Water Authority : Main contractor DAI NIPPON CONSTRUCTION "DNC" Completion certificate by Main Contractor
Year
On Going
Value
$11,500,000.00
Details
Al Mukawion worked As a subcontractor under Main contractor DNC -Japan The scope of works covered by this tendering (hereinafter referred to as "the Work") of the Project consists of the followings:
- Civil Construction Work
a) Wastewater Treatment Plant (WWTP) : Capacity 9,800m3/day
- Wastewater receiving tank, grit chamber, reactor, clarifier, disinfection tank, irrigation tank, sludge thickener, sludge drying bed and mechanical equipment for these treatment
- Power receiving facility, solar panel (capacity; 100kW), SCADA (Supervisory Control and Data Acquisition System) and electrical power/control facilities
- Pavement in the site and a garden including connection pipes for facilities with an overflow pipe.
b) Sewer Pipes: Total length =37km
- Trunk sewer installations with manholes and connection pits Dia.700-200mm -Housing connection &pits Dia 6''
- Two pipe bridges For crossing Wadi