Driving forward with passion since 1985
Driving the Palestinian Market forward through PeoplePassionInnovation

Welcome

Al-Mukawilon started and displayed its activities in 1985. With its 5 sister companies in Palestine and abroad in the fields of construction, general contracting, real estate & land development, electromechanical work and construction products industry.

The company through its 37 years life has delivered successfully more than 83 projects with a total value of about 130 million US dollars.

Highest registration in the
Contractors Union:
Grade (1A) in Building Construction
Grade (1) in Water and Irrigation
Grade (1) in Sewerage
Grade (1) in Roads

Featured Projects

Hanania & Kharraz Commercial Center

HANANIA & KHARRAZ

The scope of Works involves the Construction, Finishing Completion, Testing / Commissioning, Maintenance, Remedying of multi-story building "Tower" consist of 5 Underground floors of parking ,2 story shops , Ground & Mezzanine floors,7 offices floors roof floor. The underground parking area can accommodate around 150 cars, water tank ,west water tank & other facilities.The two underground floors are dedicated for public shops .The total project area is 22,000 m2

2022

Andalus Houses

Byder for development and real estate.

The construction of 15 duplex villas of turnkey project, about 200 m2 to 220 m2 built-up area for each villa The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe.

2022

Al Najah National University Teaching Hospital

Al-Najah National University

1. Construction of / one floor 6350 square meters at Building “D” “Teaching Hospital” within the sanctuary of Al Najah National University, Building “D” 2. Construct and build the connection metal bridge between building C+D 3. Perform infrastructure works at entrances between building C+D 4. Stone Cladding for retaining wall 1500m2

2021

Al-Royal Villas Project Phase 1 / 3 Building

Byder for development and real estate.

The construction of Luxatury villas of, turnkey project The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe.The scope of the project are 8 building with total built-up area of the project is around 8,000.00m2 / phase 1 around 1200m2.

2021

City Hills

Byder for development and real estate.

The construction of Luxatury villas of, turnkey project The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe.The scope of the project are 8 building with total built-up area of the project is around 8,000.00m2 / phase 1 around 1200m2.

2021

Reef Villas Project Contract (5/Abu Qash - Reef) – Stage #2 + #3

Palestinian Islamic Bank & Byder for development and real estate.

Stage #2+#3: The construction of 18 luxury villas of turnkey project. The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe.

2019

Construction and Finishing the Business Commercial Complex

Palestinian Islamic Bank & Byder for development and real estate.

The Construction and Finishing of the Business Commercial Complex (Turnkey) consist of three separate buildings. Each building consist of a floor for commercial stores, two floors for studios in buildings BC2 and BC3, and a floor for commercial stores, three floors for studios in building BC1, in addition to all related external works such as ( gardens, parking lots, landscaping, and complete infrastructure). Widening and rehabilitation of the main street along the 1.2 Km including the construction of sidewalks, road markings and signs. Excavation and leveling all internal roads with approximate length of 1260 m for the development. The construction of boulder stone retaining walls at the eastern property line of the project with an area of approximate 1000 m² Structural Excavations for the Business Commercial Complex with approximate quantity of 12000m3 including Rock excavation and disposal of all excavated materials off site to prepare for Center construction

2019

Reef Villas Project Contract (4& 5/Abu Qash - Reef) – Stage #1

Palestinian Islamic Bank & Byder for development and real estate.

The construction of Luxatury villas of, turnkey project The project scope includes the villas with its different types, landscape and external works including but not limited to retaining boundary walls, complete infrastructure works such as sewage, potable water, central gas, electricity and telecom, street lighting networks. The finishing of all internal roads works to include sidewalks, asphalting, road marking and singe. The total built-up area of the project is around 20,000.00m² and 12500m² of internal roads. Under panning and to be added to the scope of the project are 3 retail building located on the main road to service the project in particular and the area in general.

2016

Amaar Tower Construction

Amaar Group One of the Palestinian investment found Companies

Construction of the most prestigest Turn Key project , Rammallah The Project is located within Al Ersal Center in Al-Bireh, Palestine. The main building consists of 18 floor (including 3 basements) with an approximate built-up area of 29,900m2. The basement will be dedicated for services, storage facilities and car parking, the Ground and Mezzanine floors will be dedicated for retail use, while the remaining floors will be dedicated for office use. Work consist of all civil work and Electro-Mechanical work related

2014

Jericho Waste Water Collection, Treatment System & Reuse Project

PWA Palestinian Water Authority : Main contractor DAI NIPPON CONSTRUCTION "DNC" Completion certificate by Main Contractor

Al Mukawion worked As a subcontractor under Main contractor DNC -Japan The scope of works covered by this tendering (hereinafter referred to as "the Work") of the Project consists of the followings: - Civil Construction Work a) Wastewater Treatment Plant (WWTP) : Capacity 9,800m3/day - Wastewater receiving tank, grit chamber, reactor, clarifier, disinfection tank, irrigation tank, sludge thickener, sludge drying bed and mechanical equipment for these treatment - Power receiving facility, solar panel (capacity; 100kW), SCADA (Supervisory Control and Data Acquisition System) and electrical power/control facilities - Pavement in the site and a garden including connection pipes for facilities with an overflow pipe. b) Sewer Pipes: Total length =37km - Trunk sewer installations with manholes and connection pits Dia.700-200mm -Housing connection &pits Dia 6'' - Two pipe bridges For crossing Wadi

2014

Infrastructure Works for Al-Ersal Project – PK3

Amaar Group One of the Palestinian investment found Companies

Executive sewage, water electrical and telecom networks and roads finishing

2012

Water Loss Reduction Nablus Phase 2 Contract 4 Bid No. 85/1/63/2009

Nablus Municipality

Project involves the construction of 2 - 1000 cubic meters reservoirs,1 - 750 cubic meters reservoirs, chambers, operation rooms for 30 pumps at 13 locations and many water distribution systems sreel & ductail iron pipes ranging in diameter from 200 mm to 350 mm for a total distance of 15.4 km.

2011

Rehabilitation of connection roads for Baqa Ash sharqiya:phase 2:AnNazla Algarbiya - Tulkarm.

CHF : International Building Better World

Milling+asphalt layer+road marking & signs

2011

IRD Road – TO 3 - Tulkarem

IRD International Relief and Development, Inc

This road consists of upgrading 2.4 Km of Tulkarm road. The road is 4-2 lanes , main road located in Tulkarm city starts at Irtah crossing Terminal (sha’ar Ephraim Terminal) and ends at Tulkarm Khadouri Agriculture High school. The SOW consists of excavation works , embankment filling , pavement layers construction , installation and/or rehabilitation of storm water drainage system , installation of safety features ( signage , road marking , cat eyes , and guard rails ) and any other work items needed to complete this project as specification

2009

Finishing works and equipment supply for AN-Najah National University Auditorium

AN-Najah National University.

900 seats Auditorium Building - Design of all decoration & all systems such as Audio, Mixer, …act. , Construction & Finishing Works including electro-mechanical

2006